{"id":74436,"date":"2017-02-12T13:02:38","date_gmt":"2017-02-12T13:02:38","guid":{"rendered":"https:\/\/www.fondazioneirmaromagnoli.org\/projects\/completed-projects\/hydrotherapy-bath-funding-request\/"},"modified":"2026-09-29T19:21:17","modified_gmt":"2026-09-29T19:21:17","slug":"hydrotherapy-bath-funding-request","status":"publish","type":"page","link":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/projects\/completed-projects\/hydrotherapy-bath-funding-request\/","title":{"rendered":"Hydrotherapy Bath Funding Request"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row row_height_percent=&#8221;0&#8243; override_padding=&#8221;yes&#8221; h_padding=&#8221;0&#8243; top_padding=&#8221;2&#8243; bottom_padding=&#8221;2&#8243; overlay_alpha=&#8221;50&#8243; gutter_size=&#8221;3&#8243; shift_y=&#8221;0&#8243;][vc_column width=&#8221;1\/1&#8243;][vc_custom_heading text_color=&#8221;accent&#8221; sub_reduced=&#8221;yes&#8221;]<strong>Request for funding for the \u201cInstallation and Commissioning of a Hydrotherapy Bath\u201d project<\/strong>[\/vc_custom_heading][vc_row_inner row_inner_height_percent=&#8221;0&#8243; overlay_alpha=&#8221;50&#8243; equal_height=&#8221;yes&#8221; gutter_size=&#8221;2&#8243; shift_y=&#8221;0&#8243;][vc_column_inner width=&#8221;1\/2&#8243;][vc_gallery el_id=&#8221;gallery-931744&#8243; isotope_mode=&#8221;cellsByRow&#8221; medias=&#8221;336&#8243; gutter_size=&#8221;3&#8243; screen_lg=&#8221;1000&#8243; screen_md=&#8221;600&#8243; screen_sm=&#8221;480&#8243; single_width=&#8221;12&#8243; single_shape=&#8221;round&#8221; single_overlay_opacity=&#8221;52&#8243; single_overlay_anim=&#8221;no&#8221; single_padding=&#8221;2&#8243;][\/vc_column_inner][vc_column_inner column_width_percent=&#8221;100&#8243; gutter_size=&#8221;3&#8243; back_color=&#8221;color-lxmt&#8221; overlay_alpha=&#8221;50&#8243; medium_width=&#8221;0&#8243; shift_x=&#8221;0&#8243; shift_y=&#8221;0&#8243; z_index=&#8221;0&#8243; width=&#8221;1\/2&#8243;][vc_progress_bar values=&#8221;%5B%7B%22label%22%3A%22Project%20completion%22%2C%22value%22%3A%2235%22%7D%5D&#8221; units=&#8221;%&#8221;][\/vc_column_inner][\/vc_row_inner][vc_column_text]I, Paola Taddia, coordinator of the Chicco Balboni Educational and Rehabilitation Center in Villanova di Castenaso, managed by Casa Santa Chiara, a nonprofit social cooperative based in Bologna, am writing to request your generous support to make a butterfly-shaped hydrotherapy bath available to the children with disabilities attending our center.<\/p>\n<p>The hydrotherapy bath has already been donated to the center. It is currently still installed in a private home but has never been used. It needs to be disconnected, transported, installed, and commissioned, and the room that will house it must be adapted for the new service.<\/p>\n<p>The butterfly-shaped bath measures 280 x 200 x 100 cm and has a usable water capacity of 700 liters.<\/p>\n<p>It would be used for water-based treatments and relaxing massages, including water jets delivered through a hydrotherapy hose for underwater massage or targeted massage jets, as well as built-in whirlpool jets. The effect of the water jets can also be enhanced by adding an adjustable amount of air to improve the massage effect.<\/p>\n<p>This type of water-based activity is expected to help the children relax their muscles, relieve their joints, and improve their overall physical and psychological well-being.<\/p>\n<p>The butterfly shape allows the educator easy access from all sides.<\/p>\n<p>The equipment includes a ceiling-mounted hoist, which will need to be adapted and adjusted to the sloping ceiling of the new room.<\/p>\n<p>The room intended for the butterfly bath is currently a changing room for the gym in the center\u2019s courtyard. A partition wall will divide it into two areas: one will house the bath, while the other will remain a gym changing room. The change of use has been reported to the local municipality, which must also receive a CIL notification of commencement of works and the associated project documentation.<\/p>\n<p>Various works are required: technical design; disconnection and installation work at both the current property and the new location; moving and handling; dismantling and reassembling the hoist; electrical work for lighting, sockets in the new wall, and a 380-volt connection; plumbing for drainage, water supply, outlets, and heating; masonry work to create and seal openings and channels and install wall finishes; heating and plumbing work, including the purchase and installation of heating units, a water heater and boiler, and an extractor fan to remove humidity; and the purchase and installation of a door and all materials needed to maintain the system once installed. Finally, the installation must be tested and commissioned.<\/p>\n<p>The total cost of the works described is approximately \u20ac10,000.00.<\/p>\n<p>Work is expected to begin in mid-to-late February of this year.<\/p>\n<p>Provision must also be made for regular maintenance of the bath once it is in operation.<\/p>\n<p>This educational and rehabilitation activity, tailored to the needs and wishes of the children attending the center, is considered a valuable resource that contributes to their well-being and personal growth.<\/p>\n<p>You demonstrated your interest in this type of water-based activity a few years ago through a proposal to build a new wing at the Chicco Center with a pool for water-based activities, changing rooms, and changing tables. A fundraising campaign was to be organized for that project. Although it ultimately did not go ahead, it has remained close to all our hearts.<\/p>\n<p>I am available to provide further information, quotations, project documentation, and photographs. Trusting in your generous support, I thank you for your attention and send my warmest regards.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><em>The Center Coordinator<\/em><\/p>\n<p><em>Paola Taddia<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><em>Villanova di Castenaso, January 21, 2017<\/em>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>This educational and rehabilitation activity, tailored to the needs and wishes of the children attending the center, is considered a valuable resource that contributes to their well-being and personal growth.<\/p>\n","protected":false},"author":1,"featured_media":336,"parent":74097,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-74436","page","type-page","status-publish","has-post-thumbnail","hentry","page_category-completed-projects"],"_links":{"self":[{"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/pages\/74436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/comments?post=74436"}],"version-history":[{"count":4,"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/pages\/74436\/revisions"}],"predecessor-version":[{"id":74442,"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/pages\/74436\/revisions\/74442"}],"up":[{"embeddable":true,"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/pages\/74097"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/media\/336"}],"wp:attachment":[{"href":"https:\/\/www.fondazioneirmaromagnoli.org\/en\/wp-json\/wp\/v2\/media?parent=74436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}